Home
Download PDF
Order CD-ROM
Order in Print
CHAPTER 1. INTRODUCTION - TB-9-2350-368-250011
Starting system
Figure 1-1. M113A3 Powerplant
Figure 1-3. M548A3 Powerplant
CHAPTER 2. FABRICATION
Figure 2-1. Frame Assembly Layout--Top View
Figure 2-2. Frame Assembly Dimensions--Top View
Figure 2-3. Frame Assembly Supports--Bottom View
Figure 2-4. Forklift Pockets
Figure 2-5. Floor Plate Dimensions and Locations
Front Engine Mount (Common)
Figure 2-6. Front-Engine Mount Fabrication
Transmission Mount (M113A3/M548A3)
Transfer Gearcase Mount (M113A2/M548A1)
Figure 2-8. Transfer-Gearcase Mount Fabrication--M113A2/M548A1
Powerplant Mount Location
Figure 2-9. Powerplant Mount Location
Engine-Only-Rear Mount
Figure 2-10. Engine-Only-Rear Mount Fabrication
Battery Box
Figure 2-11. Battery Box Fabrication
Regulator Mount/Bracket
Instrument Panel Support
Figure 2-13a. Instrument Panel Hinge Points
Figure 2-13b. Instrument Panel Support
Figure 2-14. Powerplant Test Stand--Bottom View
SECTION III. FUEL SYSTEM
Figure 2-15. Fuel Line Adapter
SECTION IV. COOLING SYSTEM
Figure 2-16. Radiator Bracket/Support
Figure 2-17. Air Bleed Valve
SECTION V. ELECTRICAL SYSTEM
Transmission Controller
Figure 2-19. Transmission Controller
Accessory Cable
Accessory Cable-continued
Figure 2-20. Accessory Cable (M113A2/M113A3/M548A1 Only)
Regulator Cable (Three Leads)
Figure 2-21. Regulator Cable (Three Leads)
Regulator Cable (Four Leads)
Figure 2-22. Regulator Cable (Four Leads) (M113A2/M113A3/M548A1 Only)
Transmission Cable
Starter Cable (M113A3/M548A3)
Starter Cable (M113A2/M548A1)
SECTION VI. INSTRUMENT PANEL
Instrument Panel/Box-continued
Figure 2-26. Instrument Panel/Box
SECTION VII. TEST EQUIPMENT FABRICATION
Figure 2-27. Transmission Stall Test Tool
Brake Stall Test Tool
Brake Stall Test Tool-continued
Figure 2-28. Brake Stall Test Tool (M113A3/M548A3)
SECTION VIII. HYDRAULIC SYSTEM
CHAPTER 3. INSTALLATION
Bill Of Materials-continued - TB-9-2350-368-250066
Bill Of Materials-continued - TB-9-2350-368-250067
INSTALLATION OF COMPONENTS ON TEST STAND-continued
INSTALLATION OF COMPONENTS IN INSTRUMENT PANEL.
INSTALLATION OF COMPONENTS IN INSTRUMENT PANEL-continued
Figure 3-1. Instrument Panel Components
CHAPTER 4. OPERATION
DESCRIPTION/OPERATION.-continued
Section II. MAINTENANCE
Figure 4-1. M113A3/M548A3 Powerplant
Figure 4-2. Powerplant Installed on Test Stand
Figure 4-3. Bleeder Hose Assembly
Figure 4-4. Placement of Turbocharger Inlet Shield
Figure 4-5. Ground Bolt
Figure 4-6. Hook-Up List (M113A3/M548A3)
START - TB-9-2350-368-250082
Figure 4-7. Throttle and Shutoff Levers
REMOVE - TB-9-2350-368-250084
REMOVE-continued - TB-9-2350-368-250085
TESTING M113A2/M548A1 POWERPLANT
INSTALL-continued - TB-9-2350-368-250087
INSTALL-continued - TB-9-2350-368-250088
Figure 4-8. Hook-up List (M113A2/M548A1)
START - TB-9-2350-368-250090
REMOVE - TB-9-2350-368-250091
REMOVE-continued - TB-9-2350-368-250092
TESTING ENGINE ONLY
INSTALL-continued - TB-9-2350-368-250094
START - TB-9-2350-368-250095
REMOVE - TB-9-2350-368-250096
REMOVE-continued - TB-9-2350-368-250097
CHAPTER 5. POWERPLANT TEST STAND
Figure 5-1. Instrument Panel Box--Circuit Breakers
A3 WIRING HARNESS
A2 WIRING HARNESS
APPENDIX A. BILL OF MATERIALS/SCHEMATICS
Table A-1. Bill of Materials-continued
SCHEMATICS - TB-9-2350-368-250105
Figure A-2. 100-Amp System (M113A2 FOV)
Figure A-3. 200-Amp System (M113A2 FOV)
Figure A-4. 200-Amp Charging System
TB-9-2350-368-25 Fabrication and Operation of Powerplant Test Stand Manual