MWO 9-2330-390-25-1
REQUIREMENTS
DESCRIPTION
WORK FORCE/SKILLS
MAN-HOURS
Detaching Front and Rear Dollies
Operational
0.5
Removal of Structural Frame Sections
*Front
Operational / Mechanic
1.5
*Rear
Operational / Mechanic
1.5
Assembly of Modified Frame Sections
* Front
Operational / Mechanic
1.0
* Rear
Operational / Mechanic
1.0
Installation of Structural Frame Sections
* Front
Operational / Mechanic
2.0
* Rear
Operational / Mechanic
2.0
Placing Dolly into Transport or Travel Mode
Operational
0.5
10.0
Total man-hours required for a single application of this MWO
7. TECHNICAL PUBLICATIONS AFFECTED/CHANGED AS A RESULT OF
THIS MWO.
Date
Technical Publication
TM 9-2330-390-14&P C4
01 Nov 00
8. MWO KITS, PARTS AND THEIR DISPOSITION.
a. The following kit is required to accomplish this modification. The security
classification of this kit is unclassified. Shipping data is: weight 1120.6 lbs;
NOMENCLATURE
NSN
CAGEC
PART
Positioning Tube Reinforcement Kit
19207
57K4755
b. Positioning Tube Reinforcement Kit component parts are listed below. The listing
is used to inventory the kit for completeness. Refer to Figures 1A and 1B for a
graphical depiction of each component.
ITEM
NOMENCLATURE
RETAILER
PART NO.
QTY.
19
Beam Rear, Bottom
Fabricated
12501507
1
20
Beam Front, Bottom
Fabricated
12501504
1
21
Beam Rear, Top
Fabricated
12501508
1
22
Bolt 7 x 1/2 UNC, Hex
McMaster Carr
12501533
4
23
Bushing Steel, Shoulder
Fabricated
12501523
8
24
Nut 1/2 UNC, Locking
McMaster Carr
12501532
4
25
Shim Position Cylinder
Fabricated
12501516
4
26
Bolt 1/4 UNC, Flat Head
McMaster Carr
12501538
12
27
Assembly-Cable Lanyard
Fabricated
12501535
4
3