MWO 9-2330-390-25-1
30
Pin Cotter, Hairpin
12501530
0.05
4
31
Spacer 1.0 in. ID
12501539
0.14
4
33
Tube Lower Vertical
12501509
40.22
4
34
Tube Upper Vertical (L)
12501510
49.54
2
35
Tube Upper Vertical (R)
12501511
49.54
2
b. Weight Removed (994.9 lbs).
ITEM
NOMENCLATURE
PART NO.
WEIGHT (lbs)
QTY.
1
Top Beam
8D00107-1 (F)
273.02
2
8D00141-1 (R)
3
Bottom Beam
8D00106 1 (F)
220.93
2
8D00140 -1 (R)
13
Pin Straight, Headed
8D00060-2
1.07
4
14
Washer Flat, 1 in.
AN960-1616
0.40
4
15
Pin - Cotter
MS24665-495
0.01
4
16
Pin - Cotter
MS24665-351
0.01
4
17
Washer Flat, 1/2 in.
MS51412-8
0.03
4
18
Pin Straight, Headed
8D00060-3
0.23
4
c. Net Weight Increase (123.3 lbs).
13. QUALITY ASSURANCE REQUIREMENTS.
a. General. The following information is furnished to ensure the proper application
of this MWO and provide clarification in regard to the adequacy of installer's
inspection methods and procedures applicable to Quality Assurance (QA).
Inspection shall be IAW TM 9-2330-390-14&P, and MWO.
b. Installer Responsibilities. The installer is responsible for following instructions in
MWO 9-2330-39-25-1, and TM 9-2330-390-14&P. The installer will report
Positioning Tube Reinforcement Kits received that are damaged or missing
component parts so the kit supplier can be properly notified. Any discrepancies
noted will be corrected before the vehicle leaves the installer's work area.
Requirements contained in this MWO shall be included in the installer's
inspection plan or quality assurance program. As a minimum, a checklist will be
maintained indicating all requirements have been satisfactorily accomplished for
each kit. These requirements shall not be construed as eliminating the installer's
responsibility from complete compliance with provisions of the contract and
submitting to the Government products that meet all requirements of the contract.
c. Government Verification. All QA operations, installation changes, and
inspections performed by the installer are subject to Government verification at
unannounced and varying intervals. Verification will consist of observations and
7