TM 9-2510-247-13&P
0005 00
UNFOLDING FROM SHIPPING/STORAGE CONFIGURATION - Continued
11. Using remote control or valve control levers, MAST RETRACT until bottom of main frame
assembly (7) is approximately 1 ft. above the bottom of the mast slide (8).
12. Reinstall both clevises (4) on mast.
13. Using remote control or valve control levers, BOOM EXTEND to unfold main frame assembly
until fenders are horizontal with the prime mover fifth wheel.
NOTE
Ensure transport legs are locked in the upright position.
1 FT
Figure 20. Control Levers, Mast, and Clevis
14. Using remote control or valve control levers, MAST RETRACT until main frame is at highest
position without striking the top of the mast.
END OF WORK PACKAGE
0005 00-5