TM 9--2520--215--34
TORQUE CONVERTER AND RELATED PARTS REPAIR CONTINUED
0064 00
ASSEMBLY Continued
21. Position turbine hub (3) bearing up. Install turbine (4) vane side up. Align holes in turbine retainer (2) with holes
in turbine hub (3).
22. Install 11 new self--locking bolts (1). Torque 11 self--locking bolts (1), alternately and evenly to 23 to 29 lb--ft.
NOTE
FOLLOW ON MAINTENANCE:
Install torque converter housing assembly
(WP 0061 00)
END OF TASK
0064 00--17/18 blank