TM 9--2520--215--34
0066 00--3
INTERMEDIATE--RANGE PLANETARY CARRIER ASSEMBLY REPAIR
CONTINUED
0066 00
ASSEMBLY
WARNING
Use tongs or gloves when handling chilled parts or dry ice to avoid injury.
NOTE
New spindles should be chilled in dry ice for at least 1 hour before installation.
1. Position intermediate planetary carrier assembly (1), splined flange up, in press.
2. Coat bore of pinion (4) with oil soluble grease. Install 22 roller bearings (6) in bore of pinion (4), embedding roller
bearings (6) in grease.
3. Install thrust washers (5) at each end of pinion (4). Retain thrust washers (5) with oil soluble grease.
5
4
6
5