Table 2-5.  TROUBLESHOOTING (Continued)
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION
If resistance indication is not as specified, replace rheostat R32.
Step  4.    Using  ohmmeter,  check  for  continuity  across  terminals  of  LOAD  SELECTION  0-25  AMPS/0-12.5
AMPS switch S24.
Replace switch S24 if open indication is obtained.
Step 5.  Using ohmmeter, check for continuity across contacts of relay K10.
If continuity indication is not obtained, proceed to step 6.
Step 6.  Using DC voltmeter, check for 24 to 30 volts across coil of relay K10.
If  no  voltage  indication  is  obtained,  set  circuit  breaker  switch  CB1  to  OFF  position,  and  perform
continuity check of wiring in accordance with figure 2-4.
Step 7.  Set circuit breaker switch CB1 to OFF position.  Disconnect leads from one side of coil of relay K10,
and check for resistance of 290 ohms ±10% across coil terminals, using ohmmeter.
If resistance is not as specified, replace relay K10.
Step 8.  With circuit breaker switch CB1 set to OFF position, reconnect lead disconnected in step 7.  Using
ohmmeter, check for continuity across terminals of MASTER LOAD DISCONNECT switch S8.
Replace switch S8 if open indication is obtained.
Step   9.      Set   LOAD   SELECTION   0-25   AMPS/0-12.5   AMPS   switch   S24   to   OFF   position.      Set   LOAD
SELECTION 25 AMPS/12.5 AMPS switch S23 to ON position.  With circuit breaker switch CB1 set to
ON  position,  check  resistance  indication  between  REGULATOR  B+  and  REGULATOR  B-  binding
posts with ohmmeter.  Resistance should be 1.14 ohms ±5%.
2-27