TB 43-0213
CHAPTER 14
5-TON TRUCKS: DUMP BODY AND TAlLGATE
Section I. PRELIMINARY PROCEDURES
14-1. Component Removal.
a. Figure 14-1 provides a reference illustration for a
b. Prior to rustproofing, remove handles from the
typical 5-Ton Dump Truck,
top of the tailgate (see TM 9-2320-211-20).
TA504885
Figure 14-1, 5-Ton Dump Truck (M930).
Section Il. DRILLING AND CLEANING PROCEDURES
b. Drilling
Cab Protector Upper Braces (see
NOTE
(1) Tilt dump body up enough to gain access to
Unless otherwise indicated, all holes should
the underside of the cab protector.
be sight drilled and should be 1/2 inch
(1.3 cm) in diameter.
(2) Drill three holes A in the underside of each
upper cab protector brace. The first hole is located
10 inches (25.4 cm) from the rear. The second and
drilling instructions,
third holes are located 14 inches (35.6 cm) on center.
14-1