TB 43-0213
CHAPTER 23
1 1/2-TON CARGO TRAILER: M105 SERIES
Section I. DRILLING AND CLEANING PROCEDURES
b, Drilling Underbody (see Figure 23-2). Drill two
23-1. Drilling Procedures.
holes A in each body support channels 1, 2, 3, 4, 9, 10,
and 11. The holes are drilled 6 inches (15.2 cm) from
NOTE
the ends of the channels. Louver holes to allow easy
entry of tools.
Unless otherwise indicated, all holes
should be sight drilled and should be
1/2 inch (1.3 cm) in diameter.
The M105 Series Cargo Trailer discussed
in this
is
illustrated
in
chapter
Figure 22-1.
drilling instructions.
TA504953
Figure 23-2. Underbody.
c. Drilling Tailgate (see Figure 23-3). Drill seven
holes in tailgate:
(1) Two holes A are drilled at each end of the
upper horizontal stiffener.
(2) Two holes B are drilled at each end of the
center horizontal stiffener.
(3) Three holes C are drilled in the bottom of
TA504952
Figure 23-1. M105 Cargo Trailer.
each section of the hinge rod channel.
TA504954
23-1
160-363 0- 94- 7