TB 43-0213
CHAPTER 22
3/4-TON TRAILER: Ml101 SERIES
Section I. DRILLING AND CLEANING PROCEDURES
22-1. Drilling Procedures.
drilling instructions.
NOTE
Unless otherwise indicated, all holes
holes A in center framerail. The first hole is drilled in a
should be sight drilled and should be
centered position. The other two holes are drilled
1/2 inch (1.3 cm) in diameter.
6 inches (15.2 cm) from the outside of the framerails.
The M101 Series Trailer discussed in this
TA504944
Figure 22-1. M101 3/4-Ton Trailer.
TA504945
22-1