TB 9-2350-368-25
11. Cut floor plates (1 through 7) to dimensions shown in Figure 2-5. Tack weld in place as indicated in
Figure 2-4. (Items 13
through 17 on Bill of
Materials list). Hard
weld, if all
items are in
proper
alignment, in accordance with welding specification QQ-A-250.
12. Drill four holes in plate (2) for mounting the 100 amp regulator, using voltage regulator/200 amp
13. Test stand base may now be placed on axles and wheels or a skid according to facility requirements.