TB 9-2350-368-25
3-3.
INSTALLATION OF COMPONENTS IN INSTRUMENT PANEL.
Bill Of Materials
Item
Nomenclature
Part Number
NSN
Qty
Hardware
1
Circuit Card
12354615
1
2
Screw
MS35206-262
4
3
Washer
MS27183-42
4
4
Lockwasher
MS35333-39
4
5
Wiring Harness STE/ICE
12354594
1
6
Gasket
MS52000-10
5330-00-948-0704
1
7
Gasket
MS52000-12
5330-00-827-2815
1
8
Screw
MS35190-239
8
9
Washer
MS15795-903
8
10
Nut
MS21083N6
8
11
Cap
12258943
5935-01-114-5354
1
12
Screw
MS35207-264
1
13
Nut
MS21083N3
1
14
Circuit Breaker
MS25244-15
4
15
Gage, Water Temperature
MS24543-2
1
16
Gage, Voltage
MS24532-2
1
17
Indicator Light
8376499
6210-00-699-9457
5
18
Gage, Fuel
EGO375
1
19
Switch, Starter
12313366
1
20
Switch, Preheater
3101-0018
5935-00-075-7006
1
21
MS35916-2
1
22
Relay, Electromagnetic, Starter
1114536
1
23
Controller, Transmission
Fabricated
1
24
Controller, Transmission
12349915
1
1. Install STE/ICE circuit card assembly (1) on four weldnuts in instrument panel with four screws (2),
2. Connect STE/ICE harness to STE/ICE circuit card assembly (1) in instrument panel.
3. Install wiring harness connectors (5 and 6) and gaskets in instrument panel with eight screws, washers,
and nuts.
4. Install cap on DEC connector (J2) and secure chain to box with screw and nut.
NOTE
Connector J1 should be connected to the engine connector.
Connector J2 should be connected to the DEC for testing.
5. Install four circuit breakers (7) in instrument panel.
6. Install engine water temperature gage (8) in instrument panel.
7. Install voltage gage (9) in instrument panel.
8. Install engine low oil press indicator light (10) in instrument panel.
9. Install transmission clogged filter indicator light (11) in instrument panel.
10. Install master power indicator light (12) in instrument panel.
3-5