11. Install transmission high temp indicator light (13) in instrument panel.
12. Install transmission low oil pressure indicator light (14) in instrument panel.
13. Install fuel gage (15) in instrument panel.
14. Install starter switch (16) in instrument panel.
15. Install preheat switch (17) in instrument panel.
16. Install tachometer (18) in instrument panel only if space is available, otherwise the tachometer should be
17. Install starter relay (19) in instrument panel.
18. Install fabricated transmission controller (20) in instrument panel or vehicle transmission controller (21)
19. Install a 16 gage wire from Pin K at pack accessory cable on cart side. Run wire into instrument panel
and install glow plug indicator light assembly (24) in face of instrument panel. Connect wire to light and
connect a short piece of wire from other terminal to panel ground.
20. Install fuel switch (25) in instrument panel.
21. Install connectors (26 and 27) and gaskets in instrument panel.