Home
Download PDF
Order CD-ROM
Order in Print
Section II. MAINTENANCE
Figure 4-2. Powerplant Installed on Test Stand
TB-9-2350-368-25 Fabrication and Operation of Powerplant Test Stand Manual
Page Navigation
59
60
61
62
63
64
65
66
67
68
69
TB
9-2350-368-25
1.
Attach
powerplant
sling
(1)
to
lifting
device
(2)
of at
least
3,000
pounds
(1,362
kg)
capacity.
See
Figure
4-
1.
2.
Attach
powerplant
sling
(1)
to
lifting
brackets
(3)
and lift
powerplant
assembly
(4).
Have
helper
assist.
See
Figure
4-1.
Figure
4-1.
M113A3/M548A3
Powerplant
4-4