TM 9-2510-247-13&P
0007 00
TRANSPORT CONFIGURATION - Continued
WARNING
Ensure the boom has sufficient overhead clearance prior to folding the boom
into a vertical position. Failure to comply may result in injury or death to personnel.
4. Using remote control box or valve control levers, BOOM RETRACT (9) to raise boom to a
closed vertical position.
13
9
11
12
10
Figure 25. Hydraulic Controls and Clevis
5. Remove two clevises (10), clevis pins (11), and spring pins (12) from mast assembly (13).
6. Using remote control box or valve control levers, MAST EXTEND (14) to line up
arrows (15 and 16).
17
15
14
16
Figure 26. Remote Control and Pin Alignment
0007 00-3