Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
INSTALLATION (cont) - TM-9-2520-215-34_199
INSTALLATION - TM-9-2520-215-34_201
TM-9-2520-215-34 Recovery Vehicle Full Tracked: Heavy M88A2 (NSN 2350 01 290 4683) Manual
Page Navigation
180
181
182
183
184
185
186
187
188
189
190
TM 9--2520--215--34
0043 00--6
OUTPUT REDUCTION GEAR PLANETARY CARRIER ASSEMBLY AND
BRAKE HOUSING ASSEMBLY REPLACEMENT – CONTINUED
0043 00
INSTALLATION – Continued
5. Install ring gear assembly (14).
6. Install 18 springs (8), 18 pins (6) (long ends of facing up) and 18 new snap rings (7). Install new seal ring (9).
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business