TM 9--2520--215--34
0044 00--6
OUTPUT REDUCTION GEAR PLANETARY CARRIER ASSEMBLY REPAIR
CONTINUED
0044 00
ASSEMBLY
WARNING
Use gloves or tongs when handling dry--ice or chilled parts to prevent injury.
NOTE
Chill new spindles in dry--ice for approximately one hour before installation.
1. Install planetary carrier spacer (9) flange end first, into output reduction gear planetary carrier assembly (2).
2
9
2. Lubricate inside diameter of pinion of planetary carrier pinion (5) with oil--soluble grease. Place thrust washer (6)
and thrust washer (7) on one side of planetary carrier pinion (5). Place thrust washer (6) inside planetary carrier
pinion (5).
6
7
5
8
7
6