TM 9--2520--215--34
OUTPUT REDUCTION GEAR PLANETARY CARRIER ASSEMBLY REPAIR
CONTINUED
0044 00
ASSEMBLY Continued
NOTE
Except where both a new carrier and a new lockpin are used, stake lockpin holes by center
punching. This will ensure that lockpin does not work out during operation.
9. Perform steps 2 through 8 to install three remaining spindles, pinions, six lockwashers and 78 rollers.
WARNING
Use gloves and tongs when handling hot bearings to prevent injury.
10. Heat roller bearing (1) to approximately 300_ F. Install roller bearing (1) onto output reduction gear planetary
carrier assembly (2). Tap inner race to seat roller bearing (1) firmly against output reduction gear planetary carrier
assembly (2).
NOTE
FOLLOW--ON MAINTENANCE:
Install brake apply cam assembly
(WP 0041 00).
END OF TASK
0044 00--9/10 blank