Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
TORQUE CONVERTER PUMP ASSEMBLY REPLACEMENT
TORQUE CONVERTER AND RELATED PARTS REPAIR
TM-9-2520-215-34 Recovery Vehicle Full Tracked: Heavy M88A2 (NSN 2350 01 290 4683) Manual
Page Navigation
280
281
282
283
284
285
286
287
288
289
290
TM 9--2520--215--34
0063 00--2
TORQUE CONVERTER PUMP ASSEMBLY REPLACEMENT – CONTINUED
0063 00
INSTALLATION
1. Install
torque
converter pump assembly (4) and stator assembly (3) on ground sleeve (2).
2. Install nut (1) flat--side first, onto ground sleeve (2).
Torque
nut (1) to 300 lb ft. Stake thin outer lip of nut (1) into
two opposite grooves in ground sleeve (2).
NOTE
FOLLOW ON MAINTENANCE:
Install torque converter turbine shaft assem-
bly (WP 0067 00)
END OF TASK
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business