TM 9--2520--215--34
0063 00--2
TORQUE CONVERTER PUMP ASSEMBLY REPLACEMENT CONTINUED
0063 00
INSTALLATION
1. Install torque converter pump assembly (4) and stator assembly (3) on ground sleeve (2).
2. Install nut (1) flat--side first, onto ground sleeve (2). Torque nut (1) to 300 lb ft. Stake thin outer lip of nut (1) into
two opposite grooves in ground sleeve (2).
NOTE
FOLLOW ON MAINTENANCE:
Install torque converter turbine shaft assem-
bly (WP 0067 00)
END OF TASK