TB 43-0213
CHAPTER 8
2 1/2-TON CARGO BODY TRUCKS
Section I. PRELIMINARY PROCEDURES
8-1.
Component Removal.
Remove cargo canvas and bows from cargo body trucks, as shown in Figure 8-1, if equipped (see TM 9-2320-
209-20).
TA504855
Figure 8-1. 2 1/2 Ton Cargo Body Trucks.
Section Il. DRILLING AND CLEANING PROCEDURES
8-2.
Drilling Procedures.
NOTE
The M35A2C is the only cargo body configu-
NOTE
ration which requires drilling of the tailgate.
Unless otherwise indicated, all holes should
be sight drilled and should be 1/2 inch
(1.3 cm) in diameter.
b. Drilling Tailgate (M35A2C) (see Figure 8-2).
Drill four 1/2-inch (1. 3 cm) holes A in the tailgate center
stiffener. Holes are drilled 17 1/2 inches (44.5 cm) from
drilling instructions.
one of two holes, B, which already exist.
8-1