TB 43-0213
CHAPTER 9
2 1/2-TON TRUCKS: DUMP BODY AND TAlLGATE
Section I. PRELIMINARY PROCEDURES
b. Before beginning any rustproofing procedures,
9-1.
Component Removal.
remove the handles from the tailgate (see TM 9-2320-
a. Figure 9-1 provides a
reference illustration for
209-20).
the 2 1/2Ton Dump Truck.
TA504859
Figure 9-1. 2 1/2-Ton Dump Truck (M342A2),
Section Il. DRILLING AND CLEANING PROCEDURES
9-2.
(1) Raise the dump body enough to gain access
NOTE
to the underside of the cab protector.
Unless otherwise indicated, all holes should
be sight drilled and should be 1/2 inch
(2) Drill two holes A in cab protector braces
(1.3 cm) in diameter,
from the underside. Holes are located by measuring
20 1/2 inches (52. 1 cm) from the sides and 17 inches
drilling instructions.
(43.2 cm) from the front.
9-1