TB 43-0213
CHAPTER 10
2 1/2-TON TRUCKS: WATER TANKERS
Section I. DRILLING AND CLEANING PROCEDURES
10 holes A in bottom reinforcement structures. These
should begin approximately 2 1/2 inches (6.4 cm) from
NOTE
the left end, and be spaced about 18 inches (45.7 cm)
. Figure 10-1 provides a reference illustra-
apart. There are two holes drilled at each interval. One
tion for the 2 1/2-Ton Water Tanker.
is 1 inch (2.5 cm) from the front edge, and one is 1 inch
(2.5 cm) from the rear edge.
. Unless otherwise indicated, all holes
should be sight drilled and should be
1/2 inch (1.3 cm) in diameter.
c. Drilling
Bottom
Center
Supports (see
support. The hole is drilled 14 inches (35.6 cm) from
drilling instructions.
the outer end of each support.
TA504868
Figure 10-1. M50A2 Water Tanker.
10-1