TM 43-0139Figure 4-2. Markings on Camouflaged Equipment.Section III. INSPECTION PROCEDURES4-10. GENERALThe full CPP inspection consists of three levels of inspection: Level I, Level II, and Level III. Level I is essentially a visualconformance check from 50 feet or more. Level II is a close-up boundary inspection using a CPP overspray gauge. LevelIII is a detailed comparison of actual physical measurements to nominal dimensions.4-11. MATERIALS/TOOLS REQUIREDAfter becoming completely familiar with the inspection procedures outlined below, the inspector should assemble thefollowing materials/tools:CPP designs, including inspection worksheet (para 4-3) and overspray gauge (fig 4-3)One (1) 6-foot steel measuring tape, graduated in sixteenths (or thirty-seconds) of an inchOne (1) 6-foot steel measuring tape, graduated in tenths of an inchSmall T-square and/or straight edgeSoapstone or chalkPen, pencils, colored pencilsPaper/notebookOne plumb bob, with string4-6
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business