TM 9--2520--215--34
0064 00--8
TORQUE CONVERTER AND RELATED PARTS REPAIR CONTINUED
0064 00
ASSEMBLY
1. Position pump bearing support (27). On large diameter shoulder up, on a press bed, with clearance for bearing
OD shoulder to protrude. Position bearing (26) with OD step down, on support (26). Press bearing (26) into
support (27) until OD step face rests on support bore shoulder.
2. Position converter pump (25) vane side up, on a bench. Tap bearing support (27) large diameter shoulder down,
into bore of pump (25). Use a soft mallet.