TB 43-0213
Section Il. DRILLING AND CLEANING PROCEDURES
Drilling Procedures.
6-2.
NOTE
Unless otherwise indicated, all holes should
be sight drilled and should be 1/2 inch
(1.3 cm) in diameter,
drilling instructions.
b. Drilling Top Radiator Core Support (see
(1.3 cm).
TA504821
Figure 6-3. Drilling Tailgate.
TA504820
Figure 6-2. Drilling Top Radiator Core
Support (M1008).
(Model M 1 0 0 8 ) (see
Tailgate.
c. Drilling
1/2 inch (1.3 cm).
Drill two holes A and B in front of cargo bed. Holes are
to be drilled 12 inches (30.5 cm) in from side of cargo
TA504822
Figure 6-4. Drilling Front of Cargo Bed.
bed.
6-2